The state water board approved the first tranche of a $2.1 billion supply program, prioritizing leak reduction in systems losing more than 15% of treated water.
Two brackish desalination pilots in the Rio Grande Valley received design funding.
A plain-English guide to fixed vs. variable operating loans
Six pages, no jargon, written for owners who do their own books.


